Site icon Solar Mounting System Factory, PV Racking Wholesale, Top Quality, Best Price ! – TopBestSolar.com

22MW On-grid Solar Project Successfully Completed!

Solar rooftop installation project

Solar rooftop project

Recently, Our 22MW solar rooftop project was successfully completed and connected to the grid in Foshan, becoming a benchmark project for the local implementation of the “dual-carbon” strategy. The project uses 590W high-efficiency monocrystalline silicon modules, covers an area of ​​220,000 square meters, and operates on a “self-consumption with surplus power fed into the grid” model. The entire construction process was completed in 120 days. After commissioning, it will generate approximately 22 million kilowatt-hours of electricity annually, saving 6,600 tons of standard coal and reducing carbon emissions by 18,000 tons per year. This will not only meet the electricity needs of the industrial park but also optimize the energy structure, injecting solar energy into the green upgrading of Foshan’s manufacturing industry and the realization of the Greater Bay Area’s “dual-carbon” goals.

Solar rooftop installation project
Exit mobile version